首页 | 本学科首页   官方微博 | 高级检索  
     

超临界600MW机组闭式冷却水系统失压处理及原因
引用本文:李春和,曾祥卓.超临界600MW机组闭式冷却水系统失压处理及原因[J].电力科学与工程,2012,28(5):76-78.
作者姓名:李春和  曾祥卓
作者单位:广东珠海金湾发电有限公司,广东珠海,519050
摘    要:某厂超临界600 MW机组运行时突发闭式水系统失压故障,故障处理及时有效,分析故障原因是输灰空压机冷却器泄漏造成的,对同类型机组有借鉴意义.

关 键 词:闭式水系统  失压  空压机  泄漏

Cause Analysis on Closed Cooling Water System Pressure Loss of a 600 MW Supercritical Unit and the Treatment
Li Chunhe , Zeng Xiangzhuo.Cause Analysis on Closed Cooling Water System Pressure Loss of a 600 MW Supercritical Unit and the Treatment[J].Power Science and Engineering,2012,28(5):76-78.
Authors:Li Chunhe  Zeng Xiangzhuo
Affiliation:(Guangdong Zhuhai Jinwan Power Co.,Ltd.,Zhuhai 519050,China)
Abstract:The fault,closed cooling water system pressure loss of a 600 MW supercritical unit,was caused by the leakage of ash conveyance air compressor cooler.The treatment was timely and effective.It provides a good reference for similar unit.
Keywords:closed cooling water system  loss of pressure  air compressor  leakage
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号