首页 | 本学科首页   官方微博 | 高级检索  
     

多处理器系统可靠性约束下的节能调度算法
引用本文:张彬连,徐洪智. 多处理器系统可靠性约束下的节能调度算法[J]. 计算机应用, 2015, 35(6): 1590-1594. DOI: 10.11772/j.issn.1001-9081.2015.06.1590
作者姓名:张彬连  徐洪智
作者单位:1. 吉首大学 软件服务外包学院, 湖南 张家界 427000;2. 湖南大学 嵌入式与网络计算湖南省重点实验室, 长沙 410082
基金项目:湖南省科技计划基金资助项目
摘    要:针对多处理器系统中随机到达的任务,设计了可靠性约束下的节能调度算法(ESACR)。该算法在满足任务截止期限的前提下选择一个预计产生能耗最小的处理器以节能,在单个处理器上运用最早截止期限优先策略进行调度并尽量使各个任务的执行电压/频率均衡,当新到任务在处理器上不能满足截止期限要求时则逐个调高前面未执行任务的电压/频率。同时,为保证系统的可靠性,ESACR给正在执行的任务预留错误恢复时间以保证当发生瞬时错误时该任务能被恢复。实验结果表明,与最高电压节能调度(HVEA)、最小能耗最小完成时间调度(ME-MC)、最早完成时间优先调度(EFF)相比,ESACR在保证系统可靠性的前提下节能效果最好。

关 键 词:多处理器系统  随机任务  可靠性约束  节能  调度  
收稿时间:2014-12-23
修稿时间:2015-01-30

Energy-efficient scheduling algorithm under reliability constraint in multiprocessor system
ZHANG Binlian,XU Hongzhi. Energy-efficient scheduling algorithm under reliability constraint in multiprocessor system[J]. Journal of Computer Applications, 2015, 35(6): 1590-1594. DOI: 10.11772/j.issn.1001-9081.2015.06.1590
Authors:ZHANG Binlian  XU Hongzhi
Affiliation:1. School of Software and Service Outsourcing, Jishou University, Zhangjiajie Hunan 427000, China;
2. Key Laboratory for Embedded and Network Computing of Hunan Province, Hunan University, Changsha Hunan 410082, China
Abstract:A kind of Energy-efficient Scheduling Algorithm under the Constraint of Reliability (ESACR) for the random tasks in multiprocessor system was proposed. It would choose the processor which might consume the least energy when the task's deadline could be guaranteed. For the signal processor, Earliest Deadline First (EDF) strategy was used to schedule the tasks and all the tasks were made execute in the same voltage/frequency. When the new task could not match the deadline, the non-execution voltage/frequency of former tasks would be raised. At the same time, the recovery time was reserved for the executing task in order to promise that the task could be rescheduled when errors happened. The simulation shows that the ESACR can provide the better energy efficiency with the guarantee of system reliability , compared to Highest Voltage Energy-Aware (HVEA), Minimum Energy Minimum Completion time (ME-MC) and Earliest Finish First (EFF).
Keywords:multiprocessor system  random task  reliability constraint  energy-efficient  scheduling
本文献已被 万方数据 等数据库收录!
点击此处可从《计算机应用》浏览原始摘要信息
点击此处可从《计算机应用》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号