试论工程成本与进度的综合控制
引用本文:陈华兵,陈杰. 试论工程成本与进度的综合控制[J]. 四川电力技术, 2006, 29(5): 89-91
作者姓名:陈华兵  陈杰
作者单位:四川电力职业技术学院,四川,成都,610072;四川电力职业技术学院,四川,成都,610072
摘    要:主要论述了在水电、房建工程项目管理中,为了对成本和进度进行有效控制,必须同时监控成本和进度的变化,进而提出了综合控制法原理、操作步骤,在实际工程中具有较强的可操作性,对于水电工程具有显著的意义。

关 键 词:成本  进度  综合控制
文章编号:1003-6954(2006)05-0089-03
收稿时间:2006-06-01
修稿时间:2006-06-01

Discussion on Integrated Control between Cost and Progress of Construction Works
Chen Huabing,Chen Jie. Discussion on Integrated Control between Cost and Progress of Construction Works[J]. Sichuan Electric Power Technology, 2006, 29(5): 89-91
Authors:Chen Huabing  Chen Jie
Abstract:In order to carry out the effective control to the cost and progress in hydropower project and housing construction project management, the change of the cost and progress must be supervised in the same time, therefore, the principle and procedures of integrated control are put forward. It has a strong operability in the actual project and is of remarkable significance for the hydropower project.
Keywords:construction cost   project progress   integrated control