大型发电厂同期系统设计方案
引用本文:沙励. 大型发电厂同期系统设计方案[J]. 电力自动化设备, 2005, 25(2): 68-72
作者姓名:沙励
作者单位:广东省电力设计研究院,广东,广州,510600
摘    要:随着电力系统电网结构日益复杂和大容量机组增多,以往发电厂中同期系统的设计理念已无法适应这一变化。简述了同期系统常见模式,分析了传统同期接线设计中存在的问题及改进。在此基础上,结合新型同期装置,提出大型发电厂同期系统设计的新方案及需要与其他方面协调的各类问题。

关 键 词:同期  功角  选线
文章编号:1006-6047(2005)02-0068-05

Design of synchronization system for large power plant
SHA Li. Design of synchronization system for large power plant[J]. Electric Power Automation Equipment, 2005, 25(2): 68-72
Authors:SHA Li
Abstract:As power net turns more complex and large capacity unit increases,the design concept of power plant synchronization system should adapt to the change. The normal modes of synchro-nization system are described,the problems existed in traditional wiring design of synchronization system are analyzed and the corresponding improvements are presented. Combined with new synch-ronization equipment,a new design of synchronization system for large power plant is brought forward and the cooperation with other systems are pointed out.
Keywords:synchronization  power angle  line selection  