首页 | 本学科首页   官方微博 | 高级检索  
     


Prediction System for Change Management in Construction Project
Authors:Zhen Yu Zhao  Qian Lei Lv  Jian Zuo  George Zillante
Affiliation:1Professor and Head, Dept. of Construction Management, North China Electric Power Univ., Beijing 102206, China (corresponding author). E-mail: zhaozhenyuxm@263.net
2Assistant Engineer, Dept. of Research and Develop Management, Tianjin Electric Power Construction Co., Tianjin 300041, China. E-mail: seawolf47@163.com
3Lecturer, School of Natural and Built Environments, Univ. of South Australia, Australia 5001. E-mail: Jian.Zuo@unisa.edu.au
4Associate Professor, School of Natural and Built Environments, Univ. of South Australia, Australia 5001. E-mail: George.Zillante@unisa.edu.au
Abstract:Changes are the main causes of delays and cost overruns in construction projects. Various change management systems have been developed to minimize the impacts of changes and to facilitate good project management. This paper presents a change prediction system using activity-based dependency structure matrix (DSM) to facilitate change management. DSM is used to model the process that may occur as a result of changes. Consequently changes can be predicted by setting the change criteria for each activity in the form of rework scope. Furthermore, Monte Carlo simulation is introduced to analyze the change probability of activities involved in construction projects. The effectiveness of the prediction system is verified by applying this system to an office building project. This study provides a useful tool for project management teams to manage changes proactively and efficiently.
Keywords:Construction management  Project management  Change management  Predictions  Information management  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号