首页 | 本学科首页   官方微博 | 高级检索  
     


Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman
Authors:Ali S Alnuaimi  Ramzi A Taha  Mohammed Al Mohsin  Ali S Al-Harthi
Affiliation:1Sultan Qaboos Univ., P. O. Box 33, PC123, Al-Khoudh, Muscat, Oman (corresponding author). E-mail:alnuaimi@squ.edu.om
2Sultan Qaboos Univ., P. O. Box 33, PC123, Al-Khoudh, Muscat, Oman. E-mail:rtaha@squ.edu.om
3Higher College of Technology, P. O. Box 74, PC133, Al-Khuwair, Muscat, Oman. E-mail:almohsinmohammed@yahoo.com
4Daleel Petroleum, P. O. Box 19720, PC130, Muscat, Oman. E-mail:aliharthi@yahoo.com
Abstract:Change orders are usually issued to cover variations in scope of work, material quantities, design errors, and unit rate changes. This paper discusses variations in public construction projects in Oman by investigating causes of variations, studying their effects on the project, identifying the beneficial parties, and suggesting remedies to alleviate related problems. Tasks included an analysis of four actual case studies and conducting a field survey via a questionnaire. It was determined that the client’s additional works and modifications to design were the most important factors causing change orders, followed by the nonavailability of construction manuals and procedures. The most important effects of change orders on the project were found to be the schedule delays, disputes, and cost overruns. The contractor was found to be the party most benefiting from the change orders followed by the consultant and then the client. A set of remedial actions were suggested and respondents viewed that the revision of registration of consulting offices would be the most important action followed by establishing standard documents for design procedures and building a national database about soil conditions and services.
Keywords:Construction management  Change orders  Delay time  Project management  Costs  Oman  Case studies  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号