首页 | 本学科首页   官方微博 | 高级检索  
     

三峡永久船闸一期工程岩锚预应力监测
引用本文:李端友,汤平,李亦明.三峡永久船闸一期工程岩锚预应力监测[J].长江科学院院报,2000,17(1):39-42.
作者姓名:李端友  汤平  李亦明
作者单位:长江科学院,大坝安全监测研究所,湖北,武汉,430010
摘    要:在三峡永久船闸一期工程中布置了大量预应力锚索,部分索栓上安装有锚索测力计,研究了在锚索测力计安装及观测过程中出现的各种问题的原因;对锚固预应力变化特征、趋势及群锚效应等进行了综合分析;对岩锚施工质量及锚固效果作出了评价。

关 键 词:永久船闸  岩锚  锚固  预应力  安全监测
文章编号:1001-5485(2000)01-0039-04
修稿时间::1999-01-23

Safety monitoring of rock anchor prestress during 1st stage construction of TGP's permanent lock
LI Duan-you,TANG Ping,LI Yi-ming.Safety monitoring of rock anchor prestress during 1st stage construction of TGP''''s permanent lock[J].Journal of Yangtze River Scientific Research Institute,2000,17(1):39-42.
Authors:LI Duan-you  TANG Ping  LI Yi-ming
Abstract:A lot of prestressed anchorage cables have been embedded in rock mass of high slope during lst stage construction of TGP's permanent lock.The string dynamometers have been installed on parts of anchor bolts.The causes of various problems appeared during installing string dynamometers and monitoring procedure are investigated.The various characters and change tendency of anchorage prestress ,as well as the effects of group anchorages,etc.,are comprehensively analysed.Finally,the construction qualities and anchoring effects are evaluated.
Keywords:Three Gorges Project(TGP)  permanent lock  rock anchor  anchoring prestress  safety monitoring  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号