首页 | 本学科首页   官方微博 | 高级检索  
     

广州地铁邓村车辆段河道改移方案设计探讨
引用本文:卢荻秋,刘乐吟. 广州地铁邓村车辆段河道改移方案设计探讨[J]. 广东水利水电, 2014, 0(5): 34-36
作者姓名:卢荻秋  刘乐吟
作者单位:广东省水利水电科学研究院,广东广州510635
摘    要:根据工程现状河道,对广州地铁邓村车辆段河道改移方案设计进行了探讨,为了避免车辆段上游端出现悬河及渠道两侧高边坡问题,在排洪渠内布设四级陡坡段,陡坡段采用阶梯消能,下游设置短消力池,工程实施后较好地解决了该车辆段的河道改移问题。该方案可作为类似工程设计的参考。

关 键 词:河道改移  陡坡  阶梯消能  设计

Discussion on the River Rechanneling Design of Guangzhou Dengcun Metro Depot
LU Diqiu and LIU Leyin. Discussion on the River Rechanneling Design of Guangzhou Dengcun Metro Depot[J]. Guangdong Water Resources and Hydropower, 2014, 0(5): 34-36
Authors:LU Diqiu and LIU Leyin
Affiliation:(Guangdong Research Institute of Water Resources and Hydropower, Guangzhou 510635, China)
Abstract:Based on the situation of the river engineering , the channel change design of Guangzhou Dengcun metro depot is dis-cussed.In order to avoid the problems of suspended river in the upstream of the depot and the high channel on both sides of the riv -er, 4 steep slopes is set in the having canal .Apply step energy dissipater in the slope section while using short stilling basin in the downstream , which are a better solution to the problem of car depot channel change .The scheme can be provided as references for design and construction of similar projects in the future .
Keywords:channel change  steep slope  step energy dissipater  design
本文献已被 维普 等数据库收录!
点击此处可从《广东水利水电》浏览原始摘要信息
点击此处可从《广东水利水电》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号