首页 | 本学科首页   官方微博 | 高级检索  
     

灰土桩处理湿陷性黄土路基的施工及质量控制
引用本文:杨文俊.灰土桩处理湿陷性黄土路基的施工及质量控制[J].山西建筑,2009,35(35):268-270.
作者姓名:杨文俊
作者单位:山西路桥第二工程有限公司,山西,临汾,041051
摘    要:结合工程实际,介绍了采用灰土桩处理Ⅱ级及以上湿陷性黄土路基的施工工艺,从灰土桩的施工前准备、施工工艺流程、质量控制及检验等方面进行了阐述,以确保施工质量。

关 键 词:灰土桩  湿陷性黄土  施工工艺  质量控制

The construction and quality control of lime soil pile treating collapsible loess foundation
YANG Wen-jun.The construction and quality control of lime soil pile treating collapsible loess foundation[J].Shanxi Architecture,2009,35(35):268-270.
Authors:YANG Wen-jun
Affiliation:YANG Wen-jun
Abstract:Combining with the project practice,it introduces the construction technology of using lime soil pile to treat second and upward grade collapsible loess foundations,explains the pre-construction preparation of the lime soil pile,construction technology process,as well as quality control and test,so as to make sure of the construction quality.
Keywords:lime soil pile  collapsible loess  construction process  quality control
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号