石虎塘航电枢纽施工导流设计
引用本文:杨双超. 石虎塘航电枢纽施工导流设计[J]. 红水河, 2011, 30(1): 1-6
作者姓名:杨双超
作者单位:中水珠江规划勘测设计有限公司,广东广州,510610
摘    要:文章对石虎塘航电枢纽工程施工导流及施工期通航的有关设计内容进行了详细介绍.该设计方案分期分段多,圈堰嵌套多,断航时间短,利用二期围堰临时挡水发电,可供类似工程设计参考.

关 键 词:施工导流  围堰  施工期通航  石虎塘航电枢纽

Construction Diversion Design for Shihutang Navigation-Power Complex
YANG Shuang-chao. Construction Diversion Design for Shihutang Navigation-Power Complex[J]. Hongshui River, 2011, 30(1): 1-6
Authors:YANG Shuang-chao
Affiliation:YANG Shuang-chao(China Water Resources Pearl River Planning Surveying & Designing Co.,Ltd,Guangzhou 510610)
Abstract:The article presents a detailed introduction to the design of construction diversion and navigation during construction period for Shihutang Navigation-Power Complex.The design proposes a number of stages,sections and cofferdam nests as well as short shipping interruption,and to generate power through temporary water retaining by the 2nd stage cofferdam,which is referential for similar projects.
Keywords:construction diversion  cofferdam  navigation during construction period  Shihutang Navigation-Power Complex  