首页 | 本学科首页   官方微博 | 高级检索  
     


Efficient multi-product multi-BOM batch scheduling for a petrochemical blending plant with a shared pipeline network
Affiliation:1. School of Chemical Engineering, National Technical University of Athens, Zografou Campus, 9, Iroon Polytechniou Str., GR-15780 Athens, Greece;2. School of Science, University of Greenwich Central Avenue, Chatham Maritime, Kent ME4 4TB, UK;3. Seambiotic Ltd, Azrieli Center, 132 Menachem Begin Blvd., Tel Aviv 67021, Israel;4. Institude for Environmental Biotechnology, Rhodes University, PO Box 94, Grahamstown 6140, South Africa;1. School of Business, Universidad Adolfo Ibáñez, Diagonal Las Torres 2640, Santiago, Chile;2. Institute of Information Systems, Department of Business Administration, University of Hamburg, Von-Melle-Park 5, Hamburg 20146, Germany
Abstract:We present an effective scheduling heuristic for realistic production planning in a petrochemical blending plant. The considered model takes into account orders spanning a multi-product portfolio with multiple bills of materials per product, that need to be scheduled on shared production facilities including a complex pipeline network. Capacity constraints, intermediate storage restrictions, due dates, and the dedication of resources to specific product families have to be respected. The primary objective of the heuristic is to minimize the total order tardiness. Secondary objectives include the minimization of pipeline cleaning operations, the minimization of lead times, and the balanced utilization of filling units.The developed algorithm is based on a dynamic prioritization-based greedy search that schedules the orders sequentially. The proposed method can schedule short to mid-term operations and evaluate different plant configurations or production policies on a tactical level. We demonstrate its performance on various real-world inspired scenarios for different scheduling strategies.Our heuristic was used during the construction phase of a new blending plant and was instrumental in the optimal design of the plant.
Keywords:Batch scheduling  Chemical blending plant  Heuristic
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号