首页 | 本学科首页   官方微博 | 高级检索  
     


A fuzzy logic approach to model delays in construction projects using rotational fuzzy fault tree models
Authors:H M Al-Humaidi  F Hadipriono Tan
Affiliation:1. Department of Civil Engineering , Kuwait University , Kuwait City, Kuwait hanouf@usa.com;3. Department of Civil Engineering , The Ohio State University , Columbus, OH, 43210, USA
Abstract:Delays in construction projects are inevitable and, as a result, claims and disputes arise. Different causes of delay can come into play and therefore the need to identify and classify different causes of project delay arises. Different factors that contribute to project delay affect the likelihood of project delay in different degree of effectiveness. Fuzzy fault tree analysis (FTA) is suggested by this research to estimate the likelihood of project delay. Likelihood of delay membership function is further quantified using the weighted average defuzzification method. Two fuzzy logic models are implemented into the fuzzy FTA, using Visual Basic software: the models discussed in this research are Baldwin's rotational model and the Angular model. Comparison between the two fuzzy logic models has been carried out. Validation of the fuzzy FTA computer model is performed. Validation of the model was performed for adequacy and applicability of the model. On average, the validation performed by independent construction engineers and fuzzy logic experts produced satisfactory results. The computer software suggested by this study is an attempt to assess the likelihood of the project delay, which helps reduce delays in construction projects that can cause time loss.
Keywords:construction delay  fault tree analysis  fuzzy fault tree analysis  fuzzy logic  fuzzy set  project delay
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号