A fuzzy logic approach to model delays in construction projects using translational models
Authors:H M Al-Humaidi  F Hadipriono Tan
Affiliation:1. Department of Civil Engineering , Kuwait University , PO Box 5969, Safat, 13060, Kuwait hanouf@usa.com;3. Department of Civil Engineering , The Ohio State University , Columbus, OH, 43210, USA
Abstract:The likelihood of a project delay is affected by different factors; thus, there is a pressing need to develop a method that estimates the likelihood of such a delay. In this paper, analysis of potential occurrences of delays, which are classified into procedural, enabling, and triggering causes, is performed using the fuzzy fault-tree analysis method. Subjective judgment expresses causes of delay and their respective degree of effectiveness which are analysed in this study. The fuzzy triangular model and translational models are employed in this study. The severity of the likelihood of the project delay is the result of this analysis. A model was developed to assess the likelihood of the project delay. Evaluation of the model was performed for applicability and adequacy of the model. On average, evaluation performed by independent construction engineers and fuzzy logic experts produced satisfactory results.
Keywords:construction delay  fault-tree analysis  fuzzy fault-tree analysis  fuzzy logic  fuzzy set  fuzzy translational models  project delay
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号