首页 | 本学科首页   官方微博 | 高级检索  
     

三峡水库万州段岸边环境容量的计算与分析
引用本文:刘昭伟,陈永灿,付健,周雪漪.三峡水库万州段岸边环境容量的计算与分析[J].水力发电学报,2006,25(4):51-56.
作者姓名:刘昭伟  陈永灿  付健  周雪漪
作者单位:清华大学水利水电工程系 北京100084
基金项目:国家自然科学基金;水利部科技创新项目
摘    要:岸边水环境容量特指在岸边侧向排污的方式下,污染混合区不超过允许污染范围情况下岸边水域所能容纳的最大污染物量。本文提出了一种计算岸边水环境容量的方法,该方法以数值模拟为基础,绘制出污染混合区范围与排污负荷的变化曲线;并根据江段岸边水域的控制目标,确定出该江段的岸边环境容量。本文将该方法应用于三峡水库万州段岸边水环境容量的计算,计算结果表明,随着三峡水库水位上升,流速变缓,岸边污染混合区的范围普遍增加,排污口的最大允许负荷量随之减小,同时,江段的岸边环境容量也会相应减小,为保证三峡水库的水质,应进一步控制三峡水库的污染来源。

关 键 词:环境水力学  岸边环境容量  三峡水库  水污染控制  水质模拟
收稿时间:2005-03-04
修稿时间:2005年3月4日

Computation and analysis of environmental capacity in Wanzhou reach of Three Gorges reservoir
LIU Zhaowei, CHEN Yongcan, FU Jian, ZHOU Xueyi.Computation and analysis of environmental capacity in Wanzhou reach of Three Gorges reservoir[J].Journal of Hydroelectric Engineering,2006,25(4):51-56.
Authors:LIU Zhaowei  CHEN Yongcan  FU Jian  ZHOU Xueyi
Affiliation:Department of Hydraulic Engineering, Tsinghua University, Beijing 100084
Abstract:In this paper,a new method is presented for evaluating the water environmental capacity(WEC),which is defined as the maximum permitting mass loadings of the pollutant(MPMLP) from effluents around the received water body in the manner of side-discharge with no particularly harmful effect on beneficial uses.In this method,MPMLP is calculated via variation curves describing the relation of the scope of the mixing zone versus the mass loading of pollutant from the selected representative effluents,plotted based on the numerical results of the simulation of mixing zone by a non-horizontal multilayer model.The results of WEC are evaluated in the limit of satisfying the specified surface water criterion.The present method is applied to Three Gorges reservoir(TGR) for the evaluation of WEC in Wanzhou reach.The case study results show that Three Gorges Project will significantly expand the mixing zone and reduce both the value of NPMLP from the effluents and WEC because of the water surface leveling up and the water flow slowing down.Further measures are necessary for cutting down the mass loadings of pollutant for the protection of the water quality in TGR.
Keywords:environmental hydrodynamics  water environmental capacity  Three Gorges reservoir  wastewater control  water quality simulation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号