220 kV变电站大型敞开式主接线改造方案及安全因素研究
引用本文:茅伟杰,沈珉峰,荣富,徐璐,朱佩林,曹扣成. 220 kV变电站大型敞开式主接线改造方案及安全因素研究[J]. 电力与能源, 2021, 42(1): 68-72. DOI: 10.11973/dlyny202101014
作者姓名:茅伟杰  沈珉峰  荣富  徐璐  朱佩林  曹扣成
作者单位:国网上海市电力公司松江供电公司 ,上海 201600;国网上海市电力公司松江供电公司 ,上海 201600;国网上海市电力公司松江供电公司 ,上海 201600;国网上海市电力公司松江供电公司 ,上海 201600;国网上海市电力公司松江供电公司 ,上海 201600;国网上海市电力公司松江供电公司 ,上海 201600
摘    要:随着城市用电负荷的增加,运行时间长、设备老旧的变电站已难以满足供电可靠性的要求.在变电站原场地不停电改造、消防新旧系统的并用、"微机五防"系统的变化和通道的隔离,这都是大型敞开式变电站主接线改造的重要难点.通过分析运行超30年的某220 kV变电站大型敞开式设备的改造方案,利用3个主变之间相互的负荷转移实现不停电改造,...

关 键 词:电力网  电力系统运行  220kV变电站改造工程

Modification Scheme and Safety Factors of Large Open Main Wiring of 220 kV Substation
MAO Weijie,SHEN Minfeng,RONG Fu,XU Lu,ZHU Peilin,CAO Koucheng. Modification Scheme and Safety Factors of Large Open Main Wiring of 220 kV Substation[J]. Power & Energy, 2021, 42(1): 68-72. DOI: 10.11973/dlyny202101014
Authors:MAO Weijie  SHEN Minfeng  RONG Fu  XU Lu  ZHU Peilin  CAO Koucheng
Affiliation:(State Grid Songjiang Power Supply Company,SMEPC,Shanghai 201600,China)
Abstract:With the increase of urban electric loads,substations with long operating and old equipment have been unable to meet the requirements of power supply reliability.The modification in the original site of the substation and without power failure,and the combined use of new and old fire protection systems,and the change of the"microcomputer five prevention"system and the isolation of the passage are major difficulties and safety factors for the modification of the large open main wiring of substations.This paper analyzes modification plan of the large open equipment in the 220 kV Songjiang substation,which has been in operation for over 30 years,and uses the mutual load transfer between the three main transformers to achieve non-stop electricity retrofitting.The problem of the connection between the power supply and the transformer is solved by adding 220 kV outlets and laying reasonable cable trenches.The flexible switching of the operation mode of the firefighting operation system is adopted to solve the joint use of new and old firefighting equipment.The 220 kV side of the"microcomputer five prevention"system is connected to a charged display device,which effectively ensures the equipment maintenance process safety of personnel and equipment.The safety passage adopts hard isolation to prevent the occurrence of safety hazards.
Keywords:power grid  power system operation  220 kV substation renovation project