首页 | 本学科首页   官方微博 | 高级检索  
     

真空联合堆载预压施工质量控制
引用本文:王梁. 真空联合堆载预压施工质量控制[J]. 山西建筑, 2006, 32(19): 76-77
作者姓名:王梁
作者单位:中铁十九局集团第二工程有限公司,辽宁,辽阳,111000
摘    要:根据真空联合堆载预压工艺流程,详细论述了各个施工环节的控制要点及控制措施,总结了该方法的应用优势,在软土地基处理中可以推广应用。

关 键 词:真空联合堆载预压  塑料排水板  密封膜
文章编号:1009-6825(2006)19-0076-02
修稿时间:2006-04-11

Quality control in vacuum combined mound-load preload construction
WANG Liang. Quality control in vacuum combined mound-load preload construction[J]. Shanxi Architecture, 2006, 32(19): 76-77
Authors:WANG Liang
Abstract:According to the technological process of vacuum combined mound-load preload,it discusses the control points and control measures of every construction segment and introduces the construction quality assurance measures,and the application dominance of this method so as to spread the application of this method in the soft soil foundation treating.
Keywords:vacuum combined mound-load preload  plastic drain board  diaphragm seal
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号