摘    要:本文对螺丝湾水电站LSW/C2 标引水隧洞施工所采用的施工技术和施工方法进行了描述,并针对施工中出现的难点,特别是不良地质洞段施工提出了相应的解决办法,可供小断面、高海拔、长隧洞类似工程施工借鉴

关 键 词:螺丝湾水电站  引水隧洞施工  开挖支护  不良地质洞段施工回填  固结灌浆  地下水

Elementary Discussion on Construction of Power Tunnel of Bid LSW/C2 for Luosiwan Hydropower Station
SHEN Hong-yun,YAO Gen-zheng.Elementary Discussion on Construction of Power Tunnel of Bid LSW/C2 for Luosiwan Hydropower Station[J].Yunnan Water Power,1999(3).
Authors:SHEN Hong-yun  YAO Gen-zheng
Abstract:This paper summarized the construction technique and construction method adopted for the construction of the power tunnel of Bid LSW/C2 for Luosiwan Hydropower project, and also proposed the solutions to the problems encountered in the construction of some tunnel sections with poor geological conditions, which can be used for reference for construction of other similar long tunnels with small cross sections located on high elevations.
Keywords:power tunnel construction  of Luosiwan Hydropower Station  excavation support  construction of tunnel sections with poor geological conditions  backfilling  consolidation grouting  underground water