引张线系统在新丰江大坝的实施及运用
引用本文:郭洁惠,傅春江. 引张线系统在新丰江大坝的实施及运用[J]. 大坝与安全, 2007, 0(2): 47-50
作者姓名:郭洁惠  傅春江
作者单位:1. 广东粤电新丰江发电有限责任公司,广东,河源,517021
2. 国家电力监管委员会大坝安全监察中心,浙江,杭州,310014
摘    要:介绍了新丰江大坝引张线系统的全部实施过程、运用情况、现场维护及故障排查的工作经验,通过资料分析和系统综合评价,肯定了引张线在混凝土大坝变形监测工作中的可靠性和优越性.

关 键 词:新丰江大坝  引张线  实施  运用
文章编号:1671-1092(2007)02-0047-04
收稿时间:2007-03-15
修稿时间:2007-03-15

Implement and application of the wire alignment system at Xinfengjiang dam
GUO Jie-hui,FU Chun-jiang. Implement and application of the wire alignment system at Xinfengjiang dam[J]. Large Dam & Safety, 2007, 0(2): 47-50
Authors:GUO Jie-hui  FU Chun-jiang
Affiliation:GUO Jie-hui and FU Chun-jiang Xinfengjiang Hydropower Plant
Abstract:The paper introduced the whole implement process, application, on-spot maintenance, and the experience of malfunction discovery and elimination of the wire alignment system at Xinfengjiang dam. By the data analysis and comprehensive system appraisal, the reliability and excellence of the wire alignment in concrete dam deformation monitoring system was proved.
Keywords:Xinfengjiang dam   wire alignment   implement   application