摘 要: | 介绍了太湖新城污水处理厂二期工程的主要处理工艺、设计特点。太湖新城污水厂二期工程是在现有一期工程基础上的提标和扩建工程,采用多点进水改良A2/O工艺,建成后污水厂总处理能力达到15×104 m3/d,出水水质达到一级A标准。
|
关 键 词: | 污水处理厂 升级改造 改良A~2/O工艺 |
Design of Second-stage Project of Taihu Xincheng Wastewater Treatment Plant |
| |
Abstract: | The main treatment processes and characteristics of the Taihu Xincheng WWTP second-stage project are introduced. This is an upgrading reconstruction and extension construction project in which the improved A~2/O process with step feed is used. After the construction, the total treatment ca-pacity of the WWTP is 15×10~4 m~3/d, the effluent quality meets the first class A criteria. |
| |