首页 | 本学科首页   官方微博 | 高级检索  
     

清徐供水工程末端调蓄池液化地基处理优化设计
引用本文:王晋瑛. 清徐供水工程末端调蓄池液化地基处理优化设计[J]. 山西水利科技, 2014, 0(3): 5-7
作者姓名:王晋瑛
作者单位:山西省水利水电勘测设计研究院山西太原030024
摘    要:清徐供水工程末端调蓄池地基土存在液化问题,文中针对原地基处理设计中全坝基沉管碎石桩方案存在费用高,施工期长的问题,结合工程实际进行了优化设计。通过多方法、多方案比较,最终选用更为经济合理的局部沉管碎石桩方案,很好地解决了原方案中存在的不足。

关 键 词:末端调蓄池  液化  地基处理

Optimization Design to Treat Liquefaction Soil of Terminal Storage Pool in the Qingxu Water Supply Project
WANG Jin-ying. Optimization Design to Treat Liquefaction Soil of Terminal Storage Pool in the Qingxu Water Supply Project[J]. Shanxi Hydrotechnics, 2014, 0(3): 5-7
Authors:WANG Jin-ying
Affiliation:WANG Jin-ying
Abstract:The liquefaction problem existed in the foundation soil of the terminal storage pool of the Qingxu Water Supply Project. The original scheme to treat the foundation in design is to use the crushed stone piles with settling tubes on the whole dam foundation, but the scheme's cost is high and the construction period is long. In view of this scheme's problems and in combination with the actual situation, the optimization design has been conducted. Through the compre- hensive analysis on multiple methods and multiple schemes, the more economic and reasonable scheme, ie to form the crushed stone piles with settling tubes on partial scope of the dam foundation, is selected, and the weakness of the original design is overcomed well.
Keywords:terminal storage pool  liquefaction  foundation treatment
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号