首页 | 本学科首页   官方微博 | 高级检索  
     


Optimal earth pressure balance control for shield tunneling based on LS-SVM and PSO
Authors:Xuanyu Liu  Cheng ShaoHaifeng Ma  Renxi Liu
Affiliation:
  • a Institute of Advanced Control Technology, Dalian University of Technology, Dalian 116024, China
  • b School of Computer and Communication Engineering, Liaoning Shihua University, Fushun 113001, China
  • Abstract:To avoid ground deformation in the process of earth pressure balance (EPB) shield tunneling, it is necessary to keep the earth pressure balance on excavation face. However, at present the earth pressure control depends mainly on operation experiences which is hysteretic and could result in slow response to the change of earth pressure. To solve these problem, a predictive control strategy for earth pressure balance during excavation is proposed in this paper, where an earth pressure prediction model taking advance speed and screw conveyor speed as the control parameters is established by means of least squares support vector machine (LS-SVM). Further, by minimizing the difference between the predicted earth pressure and the desired one, an optimization model of the control parameters is established, and solved by the particle swarm optimization (PSO) algorithm. Therefore, an optimal EPB control scheme for shield tunneling automatically is presented here. The simulation results demonstrate that the method presented in this paper is very effective to control earth pressure balance.
    Keywords:Shield machine  Earth pressure balance  Control  LS-SVM  PSO
    本文献已被 ScienceDirect 等数据库收录!
    设为首页 | 免责声明 | 关于勤云 | 加入收藏

    Copyright©北京勤云科技发展有限公司  京ICP备09084417号