首页 | 本学科首页   官方微博 | 高级检索  
     

东藩运河大桥主桥连续箱梁挂篮施工方法
引用本文:苏湘华. 东藩运河大桥主桥连续箱梁挂篮施工方法[J]. 山西建筑, 2007, 33(31): 326-327
作者姓名:苏湘华
作者单位:广西公路桥梁工程总公司,广西,南宁,530001
摘    要:结合东藩运河大桥工程概况,详细介绍了主桥连续箱梁0号块的施工和连续箱梁1号~12号块段的悬臂浇筑施工,并探讨了箱梁悬臂施工测量办法和挠度控制,最后简述了合拢段的施工,具有一定的参考价值。

关 键 词:主桥  连续箱梁  挂篮施工  混凝土
文章编号:1009-6825(2007)31-0326-02
修稿时间:2007-05-30

Constructing methods of Dongfan Canal main bridge continuous pile basket
SU Xiang-hua. Constructing methods of Dongfan Canal main bridge continuous pile basket[J]. Shanxi Architecture, 2007, 33(31): 326-327
Authors:SU Xiang-hua
Affiliation:SU Xiang-hua
Abstract:Combined with the general situation of Dongfan Canal bridge project, it introduces the construction of Block 0 main bridge continuous pile and the suspended pouring construction of Block 1 -12 continuous pile. It also discusses the suspended constructing measuring method and flexibility control. Finally, it elaborates the construction of jointed section, which has a certain refering value.
Keywords:main bridge  continuous pile  basket-suspended construction  concrete
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号