低水头电站尾水段河床清理设计
引用本文:徐红祥,吴泽华.低水头电站尾水段河床清理设计[J].云南水力发电,2010,26(4):12-14,44.
作者姓名:徐红祥  吴泽华
作者单位:1. 云南省昆明市石林县水务局,云南,石林,652200
2. 福建省水利水电科学研究院,福建,福州,350001
摘    要:福建省闽江上游支流的河床式水电站有水头低、流量大、河道地形多变的特点,灯泡贯流式发电机组出力对上、下游水头差极为敏感。通过对金溏水电站尾水出口段河床滩地清理水力计算,在获得满足不影响电站机组出力要求的尾水段开挖高程和型式布置,使滩地开挖量较小。

关 键 词:低水头电站  尾水段  河床清理  电站机组出力  金溏水电站

The Design of River Bed Cleaning in Tailrace Section of a Hydropower Plant with a Low Water Head
XU Hong-xiang,WU Ze-hua.The Design of River Bed Cleaning in Tailrace Section of a Hydropower Plant with a Low Water Head[J].Yunnan Water Power,2010,26(4):12-14,44.
Authors:XU Hong-xiang  WU Ze-hua
Affiliation:XU Hong-xiang1,WU Ze-hua2(1.Shilin County Water Resources Bureau of Kunming City,Shilin 652200,Yunnan Province,China,2.Fujian Provincial Water Resources and Hydropower Scientific Research Institute,Fuzhou 350001,Fujian Province,China)
Abstract:The river bed type hydropower plants located on the upstream tributaries of the Minjiang River are characterized by low head,large discharge and variable topography of river channels,and the output of a bulb through flow type turbo-generator unit is extremely sensitive to upstream and downstream head difference in Fujian Province.The hydraulic calculation for cleaning of alluvial plain in the tailrace outlet section of Jintang Hydropower Project was made to reduce excavation quantity of the alluvium plain o...
Keywords:low head hydropower plant  tailrace section  cleaning of river bed  output of hydropower plant  Jintang Hydropower Plant  