An Approximate Model of Multistage Automatic Transfer Lines with Possible Scrapping Of Workpieces |
| |
Authors: | Mohsen A. Jafari J. George Shanthikumar |
| |
Affiliation: | a Department of Industrial Engineering and Operations, Research Syracuse University, Syracuse, NYb School of Business Administration The University of California-Berkeley, Berkeley, CA |
| |
Abstract: | We consider multistage automatic transfer lines with unreliable stages, finite interstage buffer storages, and possible scrapping of workpieces. It is assumed that the first stage never idles and the last stage never becomes blocked. Assuming that uptimes and downtimes of a stage are geometrically distributed, an approximate model is developed to compute different performance measures of the transfer line. The results obtained through the approximate model are compared to the exact results for three-stage transfer lines and to simulation results for longer transfer lines. It is observed that the approximate results are good in almost all cases considered. |
| |
Keywords: | |
本文献已被 InformaWorld 等数据库收录! |
|