喜河水电站机组轴线测量及调整
引用本文:李永强,雷和国.喜河水电站机组轴线测量及调整[J].西北水力发电,2007,23(3):116-118,122.
作者姓名:李永强  雷和国
作者单位:中国水利水电第十工程局机电安装分局,四川都江堰611833
摘    要:水轮发电机组轴线测量,是为了检查水轮发电机组轴线、主轴法兰与镜板间的不垂直度,测出它的大小和方位,以便通过有关组合面的处理,使各部摆度符合规定。

关 键 词:喜河水电站  轴线测量  盘车  调整
文章编号:1671-4768(2007)03-0116-03
修稿时间:2007-05-12

Survey and Adjustment of Turbine - generator Axes of Xihe Hydropower Station
LI Yong - qiang, LEI He - guo.Survey and Adjustment of Turbine - generator Axes of Xihe Hydropower Station[J].Journal of Northwest Hydroelectric Power,2007,23(3):116-118,122.
Authors:LI Yong - qiang  LEI He - guo
Affiliation:No. 10 hydropower Construction Bureau of China, Division of Electric Installation, Sichuan Dujiangyan 611833 ,China
Abstract:The survey of axes for turbine - generator units is to measure the verticality among t turbine -generator unit, flange of main shaft, and runner collar, and to measure the position and direction of them, in order to treat the plane of composition and to make the throw in accordance with the standard.
Keywords:Xihe hydropower station  axes survey  jigger  adjustment