首页 | 本学科首页   官方微博 | 高级检索  
     

基于基尼系数的电力网络投资分配模型及应用
引用本文:张富强,罗慧,刘梅招,高正平,栗楠,文福拴. 基于基尼系数的电力网络投资分配模型及应用[J]. 电力建设, 2016, 37(1): 9-14. DOI: 10.3969/j.issn.1000-7229.2016.01.002
作者姓名:张富强  罗慧  刘梅招  高正平  栗楠  文福拴
作者单位:1. 国网能源研究院, 北京市102209;2. 国网江苏省电力公司,南京市 210024;3. 江苏省电力公司电力经济技术研究院, 南京市 210008;4. 浙江大学电气工程学院,杭州市 310027;5. 文莱科技大学电机与电子工程系, 文莱斯里巴加湾市 BE1410
摘    要:将广泛应用于国民收入分配和环境治理领域的基尼系数引入电力网络投资分配方案设计中。首先,利用总资产回报率、未来给定时段内的预测售电量及投资售电比这3个指标, 在优先考虑效益(效率)的前提下, 综合确定电网公司未来的投资初始分配方案。然后, 选择容载比、可靠性等作为控制指标, 发展了基于基尼系数的投资分配模型, 并以投资初始分配方案为基础, 从提高分配公平性的角度优化确定最终的投资分配方案。最后, 对某省级电力网络进行实证研究, 证明所提投资分配模型的可行性。

关 键 词:电力网络  投资分配  基尼系数  洛伦兹曲线  控制指标  

A Gini Coefficient Based Investment Allocation Model for Power Networks and Its Application
ZHANG Fuqiang,LUO Hui,LIU Meizhao,GAO Zhengping,LI Nan,WEN Fushuan. A Gini Coefficient Based Investment Allocation Model for Power Networks and Its Application[J]. Electric Power Construction, 2016, 37(1): 9-14. DOI: 10.3969/j.issn.1000-7229.2016.01.002
Authors:ZHANG Fuqiang  LUO Hui  LIU Meizhao  GAO Zhengping  LI Nan  WEN Fushuan
Affiliation:1. State Grid Energy Research Institute, Beijing 102209, China;2. State Grid Jiangsu Electric Power Company, Nanjing 210024, China;3. Jiangsu Electric Power Company Econominc Research Institute, Nanjing  210008, China;4. School of Electrical Engineering, Zhejiang University, Hangzhou 310027,China;5. Department of Electrical and Electronic Engineering, Brunei Institute of Technology, Bandar Seri Begawan BE1410, Brunei
Abstract:This paper introduces the Gini coefficient widely used in the national income allocation and environmental governance into the investment allocation scheme design of power network. Firstly, we use three indexes including the return on total assets, future forecasted electricity consumption in a given period and the ratio between investment and electricity sale, to determine the initial allocation scheme of future investment in a given power network under the premise of preferentially considering the efficiency/benefits. Then, we choose capacity-load ratio, reliability and other control indexes to develop the investment allocation model based on the Gini coefficient. And we determine the final optimal investment allocation scheme from the perspective of improving the allocation fairness, based on the initial allocation scheme of future investment. Finally, a provincial power company is taken as an example to demonstrate the feasibility of the proposed investment allocation model.
Keywords:power network  investment allocation  Gini coefficient  Lorenz curve  control index
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《电力建设》浏览原始摘要信息
点击此处可从《电力建设》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号