首页 | 本学科首页   官方微博 | 高级检索  
     

抽水蓄能电站过渡过程双软件反演分析
引用本文:周喜军,杨静,丁景焕,韩文福,郭鹏,魏欢,李东阔. 抽水蓄能电站过渡过程双软件反演分析[J]. 水电与抽水蓄能, 2020, 0(1): 51-56
作者姓名:周喜军  杨静  丁景焕  韩文福  郭鹏  魏欢  李东阔
作者单位:国网新源控股有限公司技术中心
摘    要:抽水蓄能电站作为电网的有效调节工具,需要频繁地通过过渡过程工况转换等来满足电网需求,过渡过程的稳定性是影响安全运行及电网质量的重要因素.目前业内要求在电站建设的每个阶段均需要根据当前阶段的具体参数开展过渡过程计算分析.为提高计算分析的准确性,对过渡过程现场实测数据与计算数据的对比分析是非常有必要的.通过这种反演分析方法对电站过渡过程实测数据与计算软件的结果进行了详细对比,验证了前期广泛采用的两款过渡过程软件SIMSEN及浪淘石计算结果的可靠性,形成了适用于抽水蓄能电站的过渡过程反演分析技术,并总结了造成计算与实测之间差异的主要原因.研究成果可为进一步促进过渡过程计算的准确性,保障电站过渡过程的安全性提供有效参考.

关 键 词:反演分析  过渡过程  SIMSEN  浪淘石

Back Analysis Computation with Two Numerical Software for Pumped-storage Power Station Transient Process
ZHOU Xijun,YANG Jing,DING Jinghuan,HAN Wenfu,GUO Peng,WEI Huan,LI Dongkuo. Back Analysis Computation with Two Numerical Software for Pumped-storage Power Station Transient Process[J]. Hydropower and Pumped Storage, 2020, 0(1): 51-56
Authors:ZHOU Xijun  YANG Jing  DING Jinghuan  HAN Wenfu  GUO Peng  WEI Huan  LI Dongkuo
Affiliation:(Technology Center State Grid XinYuan Company Ltd.,Beijing 100161,China)
Abstract:Pumped storage power stations play a major role in the grid regulation due to their flexible.The pumped turbine is subjected to start up,shutdown or other condition transformations to meet the grid needs.Consequently,the transient process stability is therefore paramount for the power station safety.The transient process computations should be conducted in each stage of power station construction.To further improve the computation accuracy,it is necessary to analyze the differences between the results from site test and numerical simulation.In this paper,the field measurement data and the calculated results from two well-known software SIMSEN and LANG TAOSHI were compared in detail,the back analysis technology suitable for Pumped storage power station transition process was formed,and the reliability of the numerical results were verified.This research can provide an effective reference for further promoting the accuracy of the transition process prediction and ensuring the transition process safety in the Pumped-storage power station.
Keywords:back analysis  transient process  SIMSEN  LANG TAOAHI
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号