首页 | 本学科首页   官方微博 | 高级检索  
     

新疆大坂隧洞工程管片安装施工工艺
引用本文:孙艾.新疆大坂隧洞工程管片安装施工工艺[J].山西建筑,2010,36(36):148-149.
作者姓名:孙艾
作者单位:山西省水利建筑工程局,山西太原03000
摘    要:结合新疆大坂隧洞工程施工实例,针对采用全断面双护盾掘进机(简称TBM)施工的隧洞,阐述了洞内管片安装施工工艺,并提出了在管片安装过程中具体的处理措施,对保证成洞质量以及指导其他采用TBM施工的工程具有重要意义。

关 键 词:隧洞  管片  拼装  施工工艺

On construction craft of segment installation of Daban tunnel projects in Xinjiang
SUN Ai.On construction craft of segment installation of Daban tunnel projects in Xinjiang[J].Shanxi Architecture,2010,36(36):148-149.
Authors:SUN Ai
Abstract:Combining with the construction example of Daban tunnel projects in Xinjiang, the paper aims at the tunnel with the tunnel boring machine with double shields, illustrates the construction craft for the in-tunnel segment installation, and points out the factual measures in the segment installation process, so it is significant for ensuring the tunnel quality and directing other projects with TBM construction.
Keywords:tunnel  segment  installation  construction craft
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号