摘    要:中国云南省的电源结构以水电为主,水电消纳问题异常突出,且云南水电外送的受端调峰压力巨大.为充分挖掘云南电网"西电东送"通道潜力,最大限度消纳云南水电,同时响应多电网的调峰需求,文中构建了兼顾多电网调峰与水电消纳的跨流域梯级水电站调度的混合整数线性规划模型.模型采用目标权重法将多电网调峰问题转化成单目标问题,并通过调整各...

关 键 词:调峰  多电网  混合整数线性规划  特殊顺序集约束  水电消纳
收稿时间:2020-07-29
修稿时间:2021-01-28

Inter-basin Scheduling Method of Cascaded Hydropower Plants Considering Multi-grid Peak Shaving and Hydropower Accommodation
ZHONG Ruhong,CHENG Chuntian,LIAO Shengli,ZHAO Zhipeng,LIU Zhanwei. Inter-basin Scheduling Method of Cascaded Hydropower Plants Considering Multi-grid Peak Shaving and Hydropower Accommodation[J]. Automation of Electric Power Systems, 2021, 45(14): 114-122. DOI: 10.7500/AEPS20200729002
Authors:ZHONG Ruhong  CHENG Chuntian  LIAO Shengli  ZHAO Zhipeng  LIU Zhanwei
Affiliation:Institute of Hydropower and Hydroinformatics, Dalian University of Technology, Dalian 116024, China
Abstract:The power structure of Yunnan Province in China is dominated by hydropower, and the problem of hydropower accomodation is extremely prominent. In addition, the peak shaving in receiving-end of Yunnan hydropower transmission is under great pressure. In order to fully tap the potential of power transmission lines from the west to the east in Yunnan power grid, maximize the accomodation of Yunnan hydropower and respond to the peak shaving demand of multiple power grids, this paper constructs a mixed-integer linear programming model for the inter-basin scheduling of cascaded hydropower plants, which takes into account multi-grid peak shaving and hydropower accomodation. The model uses the target weight method to transform the multi-grid peak shaving problem into a single target problem. By adjusting the weight corresponding to the average value of the absolute value of the residual load anomaly for each power grid, the target meets the demands of peak shaving among multiple power grids and hydropower accomodation. Meanwhile, by introducing the special order set constraint, an simple linearization method for the minimum duration time constraint is introduced. The method can be applied to other constraints with the same type. Finally, taking 18 hydropower plants on the main stream of the Lancang River and the Jinsha River as examples, the feasibility and effectiveness of the model are verified. The results show that the proposed method can meet the needs of multi-grid peak shaving and hydropower accomodation.
Keywords:peak shaving  multiple power grids  mixed integer linear programming  special order sets constraint  hydropower accomodation