泰州二期1 000 MW超超临界二次再热机组建设与运行
引用本文:杨勤,张世山,杨宏强,张苏闽.泰州二期1 000 MW超超临界二次再热机组建设与运行[J].中国电力,2017,50(6):38-42.
作者姓名:杨勤  张世山  杨宏强  张苏闽
作者单位:1. 中国国电集团公司,北京 100034; 2. 国电江苏电力有限公司,江苏 南京 210014
基金项目:国家科技支撑计划项目(2012BAA12B00)
摘    要:阐述了1 000 MW二次再热燃煤发电机组的选型和参数确定原则,通过产学研用、严谨论证,推动重大技术创新方案和示范工程落地,探索了机组建设中的技术风险管控和工程管理要点,介绍了精细化管理、洁净化安装、全过程质量管理、精细化调试的关键要点。工程投产后,持续做好运行优化和运行管理,实现了示范工程全面达到各项性能指标,项目的建设和运行对促进中国高效清洁火力发电装备技术水平的提升,促进燃煤的清洁利用,都将具有良好的示范作用。

关 键 词:燃煤发电  1000MW  超超临界机组  二次再热循环  工程建设  运行  示范工程  
收稿时间:2017-03-20

Construction and Operation of the 1 000-MW Ultra-Supercritical Double Reheat Unit in Taizhou Ⅱ
ZHANG Shishan,YANG Qin,YANG Hongqiang,ZHANG Sumin.Construction and Operation of the 1 000-MW Ultra-Supercritical Double Reheat Unit in Taizhou Ⅱ[J].Electric Power,2017,50(6):38-42.
Authors:ZHANG Shishan  YANG Qin  YANG Hongqiang  ZHANG Sumin
Affiliation:1. Guodian Jiangsu Power Generation Co., Ltd., Nanjing 210014, China;2. China Guodian Corporation; Beijing 100034, China
Abstract:This paper describes the type selection and parameter determination principles of the 1 000-MW double reheat coal-fired power generation units. Through studies and rigorous demonstration, as well as the promotion of major technological innovation programs and the implementation of the demonstration project, the paper explores the technical risk control and project management points in the construction of the units. It also introduces the key points in the micromanagement, the clean installation, the process quality management, and the precise debugging. Since the operation, the operation optimization and management of the project have been sustained to satisfy all performance index requirements. The construction and operation of the project are demonstratively helpful for improving the technical levels of China’s efficient clean coal power generation equipments and the clean coal utilization.
Keywords:coal-fired power generation  1 000 MW  ultra-supercritical unit  double reheat cycle  construction  operation  demenstration power plant  