Abstract: | Conclusions Despite some, for now, lag behind the indices of world hydrotechnical construction achieved with the use of rollcrete technology
3], these works are presently being mastered on the construction of the Bureya dam and with a search for solutions on the
placement of a SCM at negative temperatures needed under our climatic conditions. This experience is unconditionally useful
for designing and constructing future hydrotechnical structures of the Moks, Gilyui, and other hydrostations.
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 8, pp. 47–50, August, 1995. |