首页 | 本学科首页   官方微博 | 高级检索  
     


Experience in placing roller-compacted concrete in structures of the Bureya hydroelectric station
Authors:A L Makarov  A G Breikin  A V Vasil'ev  V M Boyarskii  V V Vasilevskii  V M Bertov
Abstract:Conclusions Despite some, for now, lag behind the indices of world hydrotechnical construction achieved with the use of rollcrete technology 3], these works are presently being mastered on the construction of the Bureya dam and with a search for solutions on the placement of a SCM at negative temperatures needed under our climatic conditions. This experience is unconditionally useful for designing and constructing future hydrotechnical structures of the Moks, Gilyui, and other hydrostations. Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 8, pp. 47–50, August, 1995.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号