首页 | 本学科首页   官方微博 | 高级检索  
     


Views on Libyan national plan (LNP) to resolve water shortage problem (WSP). Part Ib: Great Man-Made River (GMMR) project — capital cost with interest rates
Authors:Abdulmonem Elhassadi  
Affiliation:

aDepartment of Chemistry, University of Garyounis, P.O. Box 7900, Benghazi, Libya

Abstract:Libyan national plan (LNP) to resolve the water shortage problem will be illustrated through a quartet of a series of papers. The first series of papers (I) will deal with Great Man-Made River (GMMR) supplied from rich ground water reservoirs located in the southern desert regions. This paper (Ib) will conduct the cost analysis study by considering the influence of interest rates on capital costs, as compared to the first paper (Ia) which neglected the effect of interest rates and treated capital costs as sunk value. This will improve the ability to analyze the viability and feasibility of this mean in comparison with other means to resolve the water shortage problem.
Keywords:LNP   WSP   GMMR   Cost analysis   Sunk value   Interest rates   Feasibility studies
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号