龙滩水电站高边坡处理的预应力锚索设计
引用本文:董金玉,赵红敏. 龙滩水电站高边坡处理的预应力锚索设计[J]. 红水河, 2004, 23(3): 15-18,21
作者姓名:董金玉  赵红敏
作者单位:中南勘测设计研究院,湖南,长沙,410014;中南勘测设计研究院,湖南,长沙,410014
摘    要:龙滩水电站边坡地质条件复杂,进水口边坡最大坡高达420m,为保证左右岸高边坡的整体稳定和工程的长期运行安全,左右岸边坡加固支护中采用了1000kN、2000kN和3000kN级预应力锚索,来提高边坡的整体稳定性。论文主要介绍了预应力锚索的设计、构造及张拉程序等。

关 键 词:高边坡  预应力锚索  锚索设计  张拉程序  龙滩水电站
文章编号:1001-408X(2004)03-0015-04

Design of Pre-stressed Anchorage Cable for High Slope Treatment in Longtan Project
DONG Jin-yu,ZHAO Hong-min. Design of Pre-stressed Anchorage Cable for High Slope Treatment in Longtan Project[J]. Hongshui River, 2004, 23(3): 15-18,21
Authors:DONG Jin-yu  ZHAO Hong-min
Abstract:Considering the 420m intake high slope and complicated geological conditions at the right bank of Longtan project, pre-stressed anchorage cables of 1 000 kN, 2 000 kN and 3 000 kN grades are adopted for reinforcement support so as to ensure the integral stability of the slope and the long-term safe operation of the project. This paper introduces the design, structure and tension control of the pre-stressed anchorage cables.
Keywords:high side slope  pre-stressed anchorage cable  anchorage cable design  tension control  Longtan project  