首页 | 本学科首页   官方微博 | 高级检索  
     

1000kV特高压输电线路不平衡度分析及换位方式的研究
引用本文:王晔.1000kV特高压输电线路不平衡度分析及换位方式的研究[J].华北电力大学学报,2010,37(5).
作者姓名:王晔
摘    要:以锡盟—南京1 000 kV特高压工程为例,借助PSCAD仿真软件研究了输电线路不同情况下的电气不平衡问题。仿真结果表明:输电线路不平衡度随着导线长度的增加而增大,随着输送功率的增加而增大,同时受导线排列方式影响较大。对于1 000 kV锡盟—南京同塔双回输电工程,推荐采用逆相序排列、反向换位方式,以实现最优的换位效果。

关 键 词:1000kV特高压  换位  不平衡度  同塔双回

Unbalanced analysis and transposition research for 1 000 kV EHV transmission lines
WANG Ye.Unbalanced analysis and transposition research for 1 000 kV EHV transmission lines[J].Journal of North China Electric Power University,2010,37(5).
Authors:WANG Ye
Abstract:PSCAD was used to study transmission line unbalance based on 1 000 kV EHV transmission project from Ximeng to Nanjing.The emulation result shows that unbalance level of transmission line is increased with the increasing of length of transmission line or transmission power and is influenced greatly by the arrangement of conductors.By studying,reverse-phase arrangement conductor and reverse transposition method is recommended to gain best effection for 1 000 kV EHV transmission project from Ximeng to Nanjing.
Keywords:1 000 kV extra-high voltage(ehv)  transposition  degree of unbalancedness  double lines on the same tower
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏