首页 | 本学科首页   官方微博 | 高级检索  
     


Scheduling on unrelated parallel machines with sequence- and machine-dependent setup times and due-date constraints
Authors:Jeng-Fung Chen
Affiliation:1. Department of Industrial Engineering and Systems Management, Feng Chia University, P.O. Box 25-097, Taichung, Taiwan, 40724, Republic of China
Abstract:We consider the unrelated parallel-machine scheduling problem with sequence- and machine-dependent setup times and due-date constraints. There are N jobs, each having a due date and requiring a single operation on one of the M machines. A setup is required if there is a switch from processing one type of job to another. Due to the characteristics of machines, the processing time depends upon the job and machine on which the job is processed, and the setup time is sequence and machine dependent. In addition, certain jobs have strict due-date constraints. An effective heuristic based on a modified apparent-tardiness-cost-with-setup procedure, the simulated annealing method, and designed improvement procedures is proposed to minimize the total tardiness of this scheduling problem. Computational characteristics of the proposed heuristic are evaluated through an extensive experiment using a newly created data set. Computational results show that the proposed heuristic is able to effectively improve the initial solutions, obtained by a modified apparent-tardiness-cost-with-setup procedure, and obtains better results than a random descent heuristic.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号