首页 | 本学科首页   官方微博 | 高级检索  
     


Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates
Authors:Hyun-Seon Choi  Hyung-Won Kim  Dong-Ho Lee  Junggee Yoon  Chang Yeon Yun  Kevin B. Chae
Affiliation:1. Department of Industrial Engineering, Hanyang University, Seongdong-gu, Seoul, 133-791, South Korea
2. SCM Consulting Team, Samsung SDS, Seoul, South Korea
Abstract:We consider the scheduling problem in hybrid flow shops that consist of two stages in series, each of which has multiple identical parallel machines. Each job has reentrant flow, i.e., the job visits each production stage several times. The problem is to determine the allocation of jobs to machines as well as the sequence of the jobs assigned to each machine for the objective of minimizing makespan subject to the maximum allowable due dates in the form of a constraint set with a certain allowance. To solve the problem, two types of algorithms are suggested: (a) a branch and bound algorithm that gives optimal semi-permutation schedules; and (b) heuristic algorithms that give non-permutation schedules. To show their performances, computational experiments were done on a number of test problems and the results are reported. In particular, one of the heuristics is competitive to the branch and bound algorithm with respect to the solution quality while requiring much shorter computation times.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号