首页 | 本学科首页   官方微博 | 高级检索  
     

某变电站山地边坡工程设计分析
引用本文:吕龙.某变电站山地边坡工程设计分析[J].广东土木与建筑,2010(1):52-54.
作者姓名:吕龙
作者单位:汕头电力设计研究院,广东汕头515041
摘    要:某山地变电站建设中有一处高约19.1m的高边坡,受场地限制而无法按照常规放坡处理,为保证边坡稳定,采用了"锚索+锚杆梁"与"抗滑桩+锚杆梁"两种支护形式进行计算分析对比,并对施工图进行细化。

关 键 词:变电站高边坡  锚索挡墙  施工图细化

Design and Analysis of the Hilly-slope-engineering of an Electric Substation
Affiliation:LV Long (Shantou Electric Power Design & Research Institute Shantou 515041,China)
Abstract:There is a 19.1m-high slope in a building mountainous electric substation,it can't put a conventional slope was subjected to the limited place.To insure the stabilization of slope,this engineering adopt 'anchor ropes+ anchor-bar beams' and'shearing piles+ anchor-bar beams' methods,then draw a conclusions of two methods were analyzed and compared,and refinement drawings.
Keywords:high slope of electric substation  retaining wall with anchor ropes  refinement drawings
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏