首页 | 本学科首页   官方微博 | 高级检索  
     

基于边缘计算的台区状态综合评价方法
引用本文:王小雷,宋耐超,史雷敏,惠杰,姜恩宇,林顺富.基于边缘计算的台区状态综合评价方法[J].电测与仪表,2023,60(12):132-138.
作者姓名:王小雷  宋耐超  史雷敏  惠杰  姜恩宇  林顺富
作者单位:上海电力大学电气工程学院,国网河南省电力公司驻马店供电公司,国网河南省电力公司许昌供电公司,国网河南省电力公司许昌供电公司,上海电力大学电气工程学院,上海电力大学电气工程学院
基金项目:国网河南省电力公司科技项目(521750200017)
摘    要:台区状态评价作为台区管理的重要环节,针对台区数据量大及缺乏规范管理等问题,文章提出了一种基于边缘计算的台区状态综合评价方法。首先将台区作为边缘计算节点,通过安装智能融合终端采集台区监测数据,并对数据就地化预处理;其次建立了一种台区特征指标体系;然后采用层次分析法和CRITIC法求出各指标的主客观权重;最后利用拉格朗日最优乘子法求得综合权重,给出台区的综合评分并判断台区的运行状态,同时将最终结果由智能融合终端上传至主站。通过对某地区的若干个台区进行实例分析,验证了该评价方法的可行性和有效性,具有一定的工程应用价值。

关 键 词:边缘计算  综合评价  层次分析法  CRITIC法
收稿时间:2020/12/17 0:00:00
修稿时间:2020/12/30 0:00:00

Comprehensive evaluation method of transformer area status based on edge computing
Wang Xiaolei,Song Naichao,Shi Leimin,Hui Jie,Jiang Enyu and Lin Shunfu.Comprehensive evaluation method of transformer area status based on edge computing[J].Electrical Measurement & Instrumentation,2023,60(12):132-138.
Authors:Wang Xiaolei  Song Naichao  Shi Leimin  Hui Jie  Jiang Enyu and Lin Shunfu
Affiliation:School of Electrical Engineering,Shanghai University of Electric Power,Zhu Madian electric power supply company,Zhu Madian City,Henan Province,Xu Chang electric power supply company,Xu Chang City,Henan Province,Xu Chang electric power supply company,Xu Chang City,Henan Province,School of Electrical Engineering,Shanghai University of Electric Power,School of Electrical Engineering,Shanghai University of Electric Power
Abstract:As an important part of transformer area management, the article proposes a comprehensive evaluation method of transformer area based on edge computing in order to solve the problems of large amount of data and lack of standardized management. First, use the transformer area as an edge computing node, collect the monitoring data of the transformer area by installing an intelligent fusion terminal, and pre-process the data on the spot; secondly, establish a transformer area characteristic index system; then use the analytic hierarchy process and the CRITIC method to find out The subjective and objective weight of each indicator; finally, the comprehensive weight is obtained by the Lagrangian optimal multiplier method, the comprehensive score of the transformer area is given, and the operation status of the transformer area is judged, and the final result is uploaded from the intelligent fusion terminal to the main station. Through the case analysis of several stations in a certain area, the feasibility and effectiveness of the evaluation method are verified, and it has certain engineering application value.
Keywords:edge computing  comprehensive evaluation  analytic hierarchy process  CRITIC method
点击此处可从《电测与仪表》浏览原始摘要信息
点击此处可从《电测与仪表》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号