首页 | 本学科首页   官方微博 | 高级检索  
     

白莲崖水库坝基扬压测值偏高原因分析
引用本文:胡庆年,薛磊.白莲崖水库坝基扬压测值偏高原因分析[J].大坝与安全,2011(4):28-30.
作者姓名:胡庆年  薛磊
作者单位:安徽省佛子岭水库管理处,安徽六安,237272
摘    要:白莲崖水库大坝初次蓄水后,部分坝基渗透压力较大、局部扬压力系数高于设计值,从地质、设计、施工、运行等多方面进行了分析,并提出了处理意见.

关 键 词:坝基  渗压  原因  分析

Reasons for high seepage pressure at foundation of Bailianya dam
HU Qing-nian,XUE Lei.Reasons for high seepage pressure at foundation of Bailianya dam[J].Large Dam & Safety,2011(4):28-30.
Authors:HU Qing-nian  XUE Lei
Affiliation:HU Qing-nian and XUE Lei// Management Department of Foziling Reservoir
Abstract:After first impoundment of Bailianya reservoir, high seepage pressure and uplift pressure exceeding designed value occurred at some dam blocks. This paper analysed the cause reasons in aspects such as geology, design, construction and operation. Further, treatment advices were presented.
Keywords:dam foundation  seepage pressure  cause reason  analysis  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号