首页 | 本学科首页   官方微博 | 高级检索  
     

碾压混凝土坝采用台阶式溢洪道消能初探
引用本文:才君眉 薛慧涛. 碾压混凝土坝采用台阶式溢洪道消能初探[J]. 水利水电技术, 1994, 0(4): 19-21,25
作者姓名:才君眉 薛慧涛
作者单位:清华大学
摘    要:台阶式溢洪道在国外许多碾压混凝土坝上得到采用,本文通过试验,分析了台阶式溢洪道的消能特性,单宽流量与消能率的关系,以及台阶面坡度对消能率的影响,以便探讨在我国碾压混凝土坝上应用台阶式溢洪道的前景。

关 键 词:碾压混凝土坝 台阶式溢洪道 消能率

A Preliminary Study on Stepped Spillway on RCC Dam for Dissipation
Cai Junmei ,Xue Huitao,Feng Jinming. A Preliminary Study on Stepped Spillway on RCC Dam for Dissipation[J]. Water Resources and Hydropower Engineering, 1994, 0(4): 19-21,25
Authors:Cai Junmei   Xue Huitao  Feng Jinming
Affiliation:Tsinghua University
Abstract:With the development of RCC dam, stepped spillways are used in many RCC dams. Ahydraulic model investigation was conducted to evaluate the per formance of a stepped spillway, andthe effectiveness of energy dissipation due to slope of the spillway face, and to evaluate possibility ofapplication in RCC arch dams.
Keywords:stepped spillway   energy dissipation efficiency   stepped face   smooth face  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号