首页 | 本学科首页   官方微博 | 高级检索  
     

工程量清单中清单工程量的计算
引用本文:王群力. 工程量清单中清单工程量的计算[J]. 福建建筑, 2008, 0(11)
作者姓名:王群力
作者单位:福建信息职业技术学院
摘    要:为提高工程量清单编制质量,准确计算清单工程量显得尤为重要。工程量计算时熟悉图纸、合理安排计算顺序、注意构件中的扣减问题,有助于提高清单工程量计算的速度和准确率。

关 键 词:清单工程量  工程量清单  计算规则  扣减

The calculation of engineering quantity in bill of quantities
Wangqunli. The calculation of engineering quantity in bill of quantities[J]. Fujian Architecture & Construction, 2008, 0(11)
Authors:Wangqunli
Affiliation:Fujian Institute of Vocational and Technical Information 350003
Abstract:In order to enhance the quality of the preparation of Quantities,the list accurately calculate the amount of work is particularly important.Engineering calculations familiar with the drawings,reasonable arrangements for the calculation of the order,attention to the issue of reduction in components,contribute to the list of projects to improve the speed of calculation and accuracy.
Keywords:Engineering quantity bill of quantities Computation rule Deducting  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号