首页 | 本学科首页   官方微博 | 高级检索  
     


Heating energy performance and part load ratio characteristics of boiler staging in an office building
Authors:Da Young LEE  Byeong Mo SEO  Yeo Beom YOON  Sung Hyup HONG  Jong Min CHOI  Kwang Ho LEE
Affiliation:1. Graduate School, Hanbat National University, Daejeon 305-719, South Korea2. College of Design, North Carolina State University, Raleigh, NC 27695-7701, USA3. Department of Mechanical Engineering, Hanbat National University, Daejeon 305-719, South Korea4. Department of Architectural Engineering, Hanbat National University, Daejeon 305-719, South Korea
Abstract:Commercial buildings account for significant portions of the total building energy in South Korea and thus a variety of research on the boiler operation related to heating energy in office buildings has been carried out thus far. However, most of the researches have been conducted on the boiler itself, i.e., the part load ratio characteristics and the corresponding gas energy consumption patterns are not analyzed in the existing studies. In this study, the part load ratio and the operating characteristics of gas boiler have been analyzed within an office building equipped with the conventional variable air volume system. In addition, the gas consumption among different boiler staging schemes has been comparatively analyzed. As a result, significant portions of total operating hours, heating load and energy consumption has been found to be in a part load ratio range of 0 through 40% and thus energy consumption is significantly affected by boiler efficiency at low part load conditions. This suggests that boiler operation at the part load is an important factor in commercial buildings. In addition, utilizing sequential boiler staging scheme can save a gas usage of about 7%. For annual heating energy saving, applying the sequential control boiler with a 3:7 proportion staging is considered to be the optimal control algorithm for maximum efficiency of boilers.
Keywords:EnergyPlus  boiler  part load ratio  gas consumption  office building  boiler staging  
点击此处可从《Frontiers in Energy》浏览原始摘要信息
点击此处可从《Frontiers in Energy》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号