首页 | 本学科首页   官方微博 | 高级检索  
     

装煤推焦车轨道基础损坏原因分析和解决方案
引用本文:罗永军. 装煤推焦车轨道基础损坏原因分析和解决方案[J]. 冶金设备, 2011, 0(Z1): 63-65
作者姓名:罗永军
作者单位:中钢设备有限公司 北京100080
摘    要:针对印度工程中出现的装煤推焦车轨道基础损坏,仔细勘察了工程现场,对问题出现的可能原因,从轨道基础设计、车辆使用和现场施工等方面进行了详细的理论分析和计算验证。根据理论分析和计算结果,提出了解决问题的方案。

关 键 词:焦炉机械  轨道基础损坏  原因分析  解决方案

Reason Analysis and Solution about Track Foundation Damage of Coal Charging & Coke Pushing Car
Luo Yongjun. Reason Analysis and Solution about Track Foundation Damage of Coal Charging & Coke Pushing Car[J]. Metallurgical Equipment, 2011, 0(Z1): 63-65
Authors:Luo Yongjun
Affiliation:Luo Yongjun(Sinosteel Engineering & Equipment Company,Beijing 100080)
Abstract:For the track foundation damage of coal charging & coke pushing car in India project,detail site survey has been implemented.To find out the possible reasons,detail theoretical analysis and calculation verification have been carried out in track foundation design,machinery force distribution and site civil construction,etc.As the theoretical analysis and calculation results,solution proposals were put forward.
Keywords:Coke oven machinery Track foundation damage Reason analysis Solution proposal  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号