混凝土桩灌注时间控制
引用本文:秦志华.混凝土桩灌注时间控制[J].山西建筑,2009,35(25):140-141.
作者姓名:秦志华
作者单位:桂林建筑安装工程有限公司,广西桂林,541002
摘    要:介绍了正常情况下混凝土桩的灌注过程,如何进行计算首批灌注混凝土的数量,并提出了如何解决混凝土桩灌注堵管问题,论述了特殊地质条件下超灌量大的混凝土桩的灌注过程和方法,从而保证混凝土桩的施工质量。

关 键 词:混凝土桩  混凝土初凝时间  灌注过程  堵管

Pouring time control of concrete pile
QIN Zhi-hua.Pouring time control of concrete pile[J].Shanxi Architecture,2009,35(25):140-141.
Authors:QIN Zhi-hua
Affiliation:QIN Zhi-hua
Abstract:Pouring process of concrete pile under normal conditions is introduced.The calculation method of initial pouring amount of concrete is presented.In view of pipe blocking question encountered in pouring process corresponding resolving measures are proposed.In the end the pouring process and method of concrete pile under particular geological conditions with extra pouring amount are discussed,in order to ensure the construction quality of concrete pile.
Keywords:concrete pile  initial setting time  pouring process  pipe blocking