引子渡水电站压力钢管分岔管制作安装与质量控制
引用本文:马振远,陈复州. 引子渡水电站压力钢管分岔管制作安装与质量控制[J]. 大坝与安全, 2004, 0(2): 54-56
作者姓名:马振远  陈复州
作者单位:引子渡水电站411水电联营体,贵州,平坝,561105;引子渡水电站411水电联营体,贵州,平坝,561105
摘    要:引子渡岔管是目前国内规模最大的洞中岔管。本文重点介绍了引子渡水电站岔管下料、卷材、预拼装、运输、焊接、安装的详细施工过程。

关 键 词:引子渡水电站  压力钢管  分岔管  制作与安装  质量控制
文章编号:1671-1092(2004)02-0054-03
修稿时间:2004-03-03

On making and installing bifurcated pipe of penstock in Yinzidu hydropower station
by MA Zhen-yuan and CHEN Fu-zhouHydropower Project Joint-operation of Yinzidu Hydropower Station. On making and installing bifurcated pipe of penstock in Yinzidu hydropower station[J]. Large Dam & Safety, 2004, 0(2): 54-56
Authors:by MA Zhen-yuan and CHEN Fu-zhouHydropower Project Joint-operation of Yinzidu Hydropower Station
Affiliation:by MA Zhen-yuan and CHEN Fu-zhou411Hydropower Project Joint-operation of Yinzidu Hydropower Station
Abstract:The bifurcated pipe of penstock in Yinzidu hydropower station is now the largest one in its scale.This paper mainly intro-duces the detailed working procedure for material cutting,bending,pre-making-up,transporting,welding and installing.
Keywords:Yinzidu hydropower station  penstock  bifurcated pipe  making and installing  quality control  