LP1000模块化施工分析
引用本文:邹,玮.LP1000模块化施工分析[J].中国核电,2014(1):42-46.
作者姓名:  
作者单位:三门核电有限公司,浙江三门317112
摘    要:文章针对AP1000机组模块化施工的技术和进度特点进行了分析,特别是对AP1000模块化施工面临的挑战和问题进行了深入的分析。这些挑战和问题有些是首台AP1000机组所特有的,有些将在后续AP1000机组建设过程中继续存在,文章分别阐述并提出了几项建议措施。

关 键 词:AP1000  模块化施工  进度控制

Analysis of the AP 1000 Modular Construction
ZOU Wei.Analysis of the AP 1000 Modular Construction[J].China Nuclear Power,2014(1):42-46.
Authors:ZOU Wei
Affiliation:ZOU Wei (Sanmen Nuclear Power Co., Ltd., Sanmen of Zhejiang Prov. 317112, China)
Abstract:This paper analyzes the features of the construction technology and schedule of AP1000 modular construction, especially the challenges and problems. Some of these challenges and problems are exclusive for the first AP1000 nuclear power unit, while the others will continue to exist in construction of the following AP1000 units. As for these two kinds of problems, respective corresponding solutions have been proposed.
Keywords:AP1000  modular construction  schedule control