首页 | 本学科首页   官方微博 | 高级检索  
     

斜拉桥索塔施工中的风致抖振影响及减振措施
引用本文:简斌.斜拉桥索塔施工中的风致抖振影响及减振措施[J].山西建筑,2008,34(2):323-324.
作者姓名:简斌
作者单位:西南科技大学土木工程与建筑学院,四川绵阳,621010
摘    要:详细阐述了抖振的定义,分析了抖振对于施工期斜拉桥自立索塔的影响以及抖振研究的三种基本方法,在此基础上,详细论述了目前针对施工阶段斜拉桥自立索塔的减振措施,以减少主塔顶端的抖振响应。

关 键 词:抖振  斜拉桥  索塔  减振措施
文章编号:1009-6825(2008)02-0323-02
收稿时间:2007-09-10
修稿时间:2007年9月10日

The influence of wind-induced buffeting in the construction of cable support tower in cable-stayed bridge and measures for vibration reduction
JIAN Bin.The influence of wind-induced buffeting in the construction of cable support tower in cable-stayed bridge and measures for vibration reduction[J].Shanxi Architecture,2008,34(2):323-324.
Authors:JIAN Bin
Abstract:The following paper illustrates the definition of buffeting,analyzes the influences of buffeting on cable support tower of cable-stayed bridge in construction period,introduces three basic methods for the research of buffeting,and discusses vibration reducing measures in light of the cable support tower,in order to reduce buffeting response on the top of main tower.
Keywords:buffeting  cable-stayed bridge  cable support tower  vibration reducing measure
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号