首页 | 本学科首页   官方微博 | 高级检索  
     


Assessment of transmission cost recovery applying marginal pricing in hydrothermal power systems
Affiliation:1. Power Systems Department, CEPEL, Electric Power Research Centre, Ilha do Fundao, P.O. Box 68007, Cidade Universitaria, 21944-970 Rio de Janeiro, RJ, Brazil;2. PSRI, Power Systems Research Inc., Rio de Janeiro, RJ, Brazil;3. Transmission Planning Department, ELETROBRÁS, Rio de Janeiro, RJ, Brazil
Abstract:This paper describes an integrated framework to evaluate short-run marginal costs (SRMC) in hydrothermal systems, taking into account the chronological aspects of reservoir operation, transmission constraints, equipment failures, hydrological variation and load uncertainty. The resulting SRMC values are used to calculate circuit revenues, which are then compared with investment requirements. It is shown that the representation of these probabilistic factors substantially increases revenues, in contrast with the widely reported under-recovery found in studies which only represent normal operating conditions. Case studies with the Brazilian North-Northeastern system are presented and discussed.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号