首页 | 本学科首页   官方微博 | 高级检索  
     

青海钾肥厂一期工程建设方案的选择及实施
引用本文:戴芳发. 青海钾肥厂一期工程建设方案的选择及实施[J]. 化工矿物与加工, 1992, 0(2)
作者姓名:戴芳发
作者单位:化工矿山设计研究院
摘    要:本文从建厂规模、产品方案、厂址方案和总图布置、采卤方式、盐田光卤石矿采收、盐田规模及其建造、老卤排放、氯化钾产品加工方案、供电供水及引进设备等10个方面,回顾了青海钾肥厂一期工程重大建设方案的选择及实施情况。

关 键 词:钾肥厂  卤化矿床  化工矿开采方案

Selection and implementation of the construction programme for the first phase of the Qinghai Potash Fertilizer Project
Dai Fangfa. Selection and implementation of the construction programme for the first phase of the Qinghai Potash Fertilizer Project[J]. Industrial Minerals and Processing, 1992, 0(2)
Authors:Dai Fangfa
Affiliation:Design & Research Institute for Chemical Mines
Abstract:The paper reviews the selection and implementation of the major construction programme for the first phase of the Qinghai Potash Fertilizer Project in ten aspects of plant size, product programme , plant location and general layout, brine harverting manner, carnallite harvesting from salt pans,salt pan size and construction, end brine drainage, potassium chloride products processing programmes, power and water supply and equipment import.
Keywords:Potassium fertilizer plant   Deposite of halides   Chemical mineral mining   Project
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号