首页 | 本学科首页   官方微博 | 高级检索  
     

输电断面的有功安全预防-校正负荷调整算法
引用本文:钟贵和,王星华,甘德树,彭显刚. 输电断面的有功安全预防-校正负荷调整算法[J]. 电力系统保护与控制, 2014, 42(16): 15-20
作者姓名:钟贵和  王星华  甘德树  彭显刚
作者单位:广东工业大学自动化学院,广东 广州 510006;广东工业大学自动化学院,广东 广州 510006;广东电网公司珠海供电局,广东 珠海 519000;广东工业大学自动化学院,广东 广州 510006
基金项目:南方电网公司科技项目(K-GD2012-132)
摘    要:当输电断面支路出现重载时,应启动预防控制措施,避免线路过载;当切除过载线路可能引发输电断面连锁跳闸时,应启动过载校正措施,消除支路过负荷;必须切负荷时,应尽量减少切负荷量。采用原-对偶内点法求解非线性规划模型,获得消除支路过负荷的控制方案。为了将有功校正算法应用于机组调整能力有限的地区电网,将有功校正的主要调整对象扩展到负荷节点。依据负荷节点对降低越限支路和重载支路潮流的综合作用提出综合灵敏度概念,并根据该概念确定加减负荷节点。利用反向配对技术,模拟负荷在送电端或受电端内的相邻节点间转移,达到消除支路过负荷的目的。针对某地区电网进行仿真计算,表明所提出控制算法的有效性。

关 键 词:输电断面  安全校正  综合灵敏度  负荷调整  原对偶内点法
收稿时间:2013-10-12
修稿时间:2013-12-11

Load adjusted algorithm on active power prevention-correction of transmission section
ZHONG Gui-he,WANG Xing-hu,GAN De-shu and PENG Xian-gang. Load adjusted algorithm on active power prevention-correction of transmission section[J]. Power System Protection and Control, 2014, 42(16): 15-20
Authors:ZHONG Gui-he  WANG Xing-hu  GAN De-shu  PENG Xian-gang
Affiliation:Faculty of Automation, Guangdong University of Technology, Guangzhou 510006, China;Faculty of Automation, Guangdong University of Technology, Guangzhou 510006, China;Zhuhai Power Supply Bureau, Guangdong Power Grid Corporation, Zhuhai 519000, China;Faculty of Automation, Guangdong University of Technology, Guangzhou 510006, China
Abstract:In case of heavy load in transmission section, preventive controls should be taken to avoid transmission line overload. In case that the removal of overload lines can cause cascading trip, power correction should be executed. Load shedding should be minimized if needed. The paper applies prime-dual interior point method to solve nonlinear programming model and achieve adjustment scheme. In order to apply active power correction algorithm to the regional network where generators adjustment is limited, the major adjustment objects extend to PQ bus. According to the combined influence on the overload lines and close-to-limit line, an integrative sensitivity index is presented to ascertain whether a bus load should be increased or decreased. The equal and opposite adjustment in pairs is introduced to simulate that loads migrate in limited area, on this account transmission line overload is eliminated. The simulation results of a local grid show that the proposed algorithm is feasible.
Keywords:transmission section   active power correction   integrative sensitivity   PQ bus adjustment   prime-dual interior point method
本文献已被 CNKI 等数据库收录!
点击此处可从《电力系统保护与控制》浏览原始摘要信息
点击此处可从《电力系统保护与控制》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号